Poor Farm Road Bridge Closure Announcement

Beginning on or about Monday, July 27, 2015 Mercer County DOT will begin repair of the Poor Farm Road Bridge over a tributary of Jacobs Creek. This bridge is located approximately 1/2 mile south of Harbourton Woodsville Road.

During the repair work the bridge will be closed to all traffic on a 24/7 basis. This project is expected to be complete within 60 days, weather permitting.

A detour will be posted directing motorists to use Harbourton-Woodsville Road, Trenton-Harbourton Road and Woosamonsa Road.  

Motorists should plan alternate routes during this construction period.

 

Bayberry Road Bridge Closure Announcement

Beginning on or about Monday, July 20, 2015 Mercer County DOT will begin repair of the Bayberry Road Bridge over a tributary of Honey Branch Brook. This bridge is located approximately 1,100 feet east of Morris Drive.

 During the repair work the bridge will be closed to all traffic on a 24/7 basis. This project is expected to be complete within 60 days, weather permitting.

 The eastbound detour will be Pennington Rocky Hill Road to Carter Road.

 The westbound detour will be Alta Vista Drive to Elm Ridge Road to Pennington Rocky Hill Road.

Motorists should plan alternate routes during this construction period.

 

 

Pennington Titusville Road Bridge Closure      

The Mercer County Department of Transportation began work on Monday February 23, 2015 replacing the Pennington-Titusville Road Bridge which crosses over Jacobs Creek.

Pennington-Titusville Road between Scotch Road and Bear Tavern Road will be closed to traffic at the bridge during this construction period which is scheduled to last six months.

The eastbound detour route will be Bear Tavern Road S/B to Washington Crossing Pennington Road E/B to Scotch Road N/B.

The westbound detour will be Scotch Road S/B to Washington Crossing Pennington Road W/B to Bear Tavern Road N/B.

Motorists should plan alternate routes during this construction period.

 


 Please continue check this advisory banner for further updates.    Refresh/reload the page periodically to ensure you are seeing the latest information.

   Home
Contact Us
 
 

Road Advisories & Report a Pothole or Road Issue

Use the following form to report a pothole on a Hopewell Township Road or other Road Issue.

All fields are required information.

Name *
Address *
City *
State *
Zip Code *
Email *
Confirm Email *
Subject *
Problem and Location *
Type the anti-spam code:
 

Road Advisories

Van Dyke Road Bridge (No. 234.1) will be closed for repairs on a 24/7 basis beginning Monday, April 28, 2014

Bear Tavern Road (County Route 579) Milling and Resurfacing Work Begins April 7th

Roadway Improvement Harbourton-Rocktown Road

Lambertville-Hopewell Road - County Road 518 - Begins September 3, 2013

Elm Ridge Road (CR 625) - Emergency Repairs beginning Monday May 13, 2013

The following is the update on Mercer County bridge projects:

Woosamonsa Rd: Under construction using County Work Force.   Estimated completion Dec. 2012.

River Drive:   Design planned for in 2012 budget.  Anticipate using outside contractor for construction.  Permitting issues include Historic Preservation approvals.   Estimated completion sometime in 2014/2015.

 

NEW PROJECTS

Dublin Rd:     Present in design.  Estimated start in mid-2013.

Penn.-Titusville Rd:   Presently in design.    Start date not yet estimated.

Date
Road Notice
06/28/13
04/24/13
03/19/12
04/14/11
04/08/11
03/30/11
08/02/10
05/19/10

 

 

 

 

 
TextMenu | Privacy Statement | Register for E-mail Notifications | Contact Us
201 Washington Crossing - Pennington Road  •  Titusville, NJ 08560  •  (609) 737-0605