Pennington-Rocky Hill Road Construction Work Announcement

Beginning on or about Monday, August 31, 2015, Mercer County DOT will begin milling and resurfacing work on Pennington-Rocky Hill Road from King George Road to Elm Ridge Road.

This section of roadway will be closed to through traffic between the hours of 9:00 AM and 3:00 PM (weekdays).

A detour for westbound traffic will direct motorists to Elm Ridge Road, Carter Road, Cold Soil Road, Blackwell Road, Federal City Road, to Delaware Avenue.

Eastbound traffic will be directed to follow the same route conversely.

Weather permitting, work on this project is anticipated to be compltete in 10 days.  

 

Intersection of Lawrenceville-Pennington Road and South Main Street construction work

Beginning on or about Thursday, August 13, 2015 Mercer County DOT will begin road resurfacing and construction of a new traffic island.

Phase 1: The entire intersection will be milled. During this phase, Pennington Lawrenceville Road will be closed to through traffic during the hours of 9:00 AM to 3:30 PM (weekdays). Motorists will be directed to use Blackwell Road and Pennington Road.

Once the intersection is milled, it will be temporarily restriped according to the permanent traffic pattern.

Phase 2: New curbing will be installed in accordance with the permanent traffic pattern.

Phase 3: The roadway area will be resurfaced and lanscaping will be performed. Detours as per phase 1 will be in place.

Motorists should plan alternate routes during this construction.

Weather permitting, work on this project is anticipated to be complete by August 28th.  

 

 

Poor Farm Road Bridge Closure Announcement

Beginning on or about Monday, July 27, 2015 Mercer County DOT will begin repair of the Poor Farm Road Bridge over a tributary of Jacobs Creek. This bridge is located approximately 1/2 mile south of Harbourton Woodsville Road.

During the repair work the bridge will be closed to all traffic on a 24/7 basis. This project is expected to be complete within 60 days, weather permitting.

A detour will be posted directing motorists to use Harbourton-Woodsville Road, Trenton-Harbourton Road and Woosamonsa Road.  

Motorists should plan alternate routes during this construction period.

 

Bayberry Road Bridge Closure Announcement

Beginning on or about Monday, July 20, 2015 Mercer County DOT will begin repair of the Bayberry Road Bridge over a tributary of Honey Branch Brook. This bridge is located approximately 1,100 feet east of Morris Drive.

 During the repair work the bridge will be closed to all traffic on a 24/7 basis. This project is expected to be complete within 60 days, weather permitting.

 The eastbound detour will be Pennington Rocky Hill Road to Carter Road.

 The westbound detour will be Alta Vista Drive to Elm Ridge Road to Pennington Rocky Hill Road.

Motorists should plan alternate routes during this construction period.

 

 

 

 


 Please continue check this advisory banner for further updates.    Refresh/reload the page periodically to ensure you are seeing the latest information.

   Home
Contact Us
 
 

HOPEWELL TOWNSHIP DOCUMENT LIBRARY

Documents folder
Documents folder
Newsletters
Documents folder
DOCUMENTS
Planning Recommendations
Planning Recommendations
Guidelines
Guidelines
Guidelines
Guidelines
Guidelines
Guidelines
Guidelines
Guidelines
Guidelines
Guidelines
Guidelines
Guidelines
Guidelines
Guidelines
Guidelines
Guidelines
Planning Recommendations
Planning Recommendations
Planning Recommendations
Planning Recommendations
Planning Recommendations
 

 

 
TextMenu | Privacy Statement | Register for E-mail Notifications | Contact Us
201 Washington Crossing - Pennington Road  •  Titusville, NJ 08560  •  (609) 737-0605