Milling and paving work scheduled for Bear Tavern Road

 On or about Monday, June 27, 2016, Mercer County D.O.T. will commence milling resurfacing work on Bear Tavern Road (CR 579) from Maddock Road to Church Road in Hopewell Township.

 Work will be performed from 9:00 a.m. to 3:00 p.m., Monday through Friday.

 Mercer County proposes to complete the milling and resurfacing of Bear Tavern Road as follows:

 Phase One: Half width construction from Maddock Road to Washington Crossing Road. Traffic would be maintained in the northbound direction. Southbound traffic would be detoured with motorists directed to use Washington Crossing Road to Jacobs Creek Road.

 Phase Two: Half width construction from Washington Crossing Road to Church Road. Again, traffic would be maintained in the northbound direction. Southbound traffic would be detoured with motorists directed to use Pennington-Harbourton Road, Scotch Road and Washington Crossing Road.

 Full, unrestricted access will be permitted during non-working hours.

 Mercer County anticipates this work will take approximately fifteen (15) working days, weather permitting.

 

Road Construction Notice

The Province Line Road CSX Railroad Crossing will be undergoing reconstruction beginning today, Monday, June 20th and will remain closed for approximately 1 week.

The crossing will be impassable to all traffic during this period.

 Detour: County Route 518 to Hopewell Amwell Road.

  

Road Construction Notice

Beginning on or about Monday, May 2, 2016, Mercer County DOT will be rehabilitating the stone arch of the Wargo Road Bridge located approximately ½ mile north of Titusmill Road.

This will require a full closure of Wargo Road on a 24/7 basis.

The work is anticipated to last approximately 90 days.

During construction, a detour will be posted directing motorists to use Pennington-Rocky Hill Road, Darrow Drive, Westcott Boulevard and Bradford Lane.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 Please continue check this advisory banner for further updates.    Refresh/reload the page periodically to ensure you are seeing the latest information.

   Home
Contact Us
 
 

County Route 546
Bikeway Planning & Development Study
Final Action Plan
July 2010

Please note that all of the documents below are provided in PDF.

Final Action Plan (29MB document)
Appendix A - NJDOT Bicycle Compatible Roadway Pavement Widths
Appendix B - Route 31 Initially Preferred Alertnative (IPA)
Appendix C - Study Task Force Meeting Memorandums
      Meeting 1
      Meeting 2
Appendix D - Preliminary Cost Estimating Sheets
      Bicycle_Lane_Striping_Cost Estimate
      Intersection_Striping_Cost Estimate
      Signed_Bicycle_Route_Cost Estimate
Appendix E - Signed Bicycle Route - Recommended Sign Locations

Appendix F - Funding Pedestrian and Bicycle Planning, Programs and Projects

 

 
TextMenu | Privacy Statement | Register for E-mail Notifications | Contact Us
201 Washington Crossing - Pennington Road  •  Titusville, NJ 08560  •  (609) 737-0605