Milling and Resurfacing Road Work (Hopewell-Rocky Hill Road)

On or about Tuesday, May 26, 2015, Mercer County DOT will begin milling and resurfacing work on Hopewell-Rocky Hill Road (CR 518) from Province Line Road to Maple Street.

Construction will occur between the hours of 9:00 AM to 3:30 PM, weekdays only.

During construction, westbound Hopewell-Rocky Hill Road will be closed to through traffic. Motorists will be directed to turn left onto Province Line Road, right onto Cherry Valley Road, right onto Hopewell-Princeton Road to East Broad Street.

Eastbound traffic is slated to remain open. This could change depending on project needs.

Motorists should expect minor delays due to this construction.

 

Road Closure Announcement         Pennington Titusville Road     

The Mercer County Department of Transportation began work on Monday February 23, 2015 replacing the Pennington-Titusville Road Bridge which crosses over Jacobs Creek.

Pennington-Titusville Road between Scotch Road and Bear Tavern Road will be closed to traffic at the bridge during this construction period which is scheduled to last six months.

The eastbound detour route will be Bear Tavern Road S/B to Washington Crossing Pennington Road E/B to Scotch Road N/B.

The westbound detour will be Scotch Road S/B to Washington Crossing Pennington Road W/B to Bear Tavern Road N/B.

Motorists should plan alternate routes during this construction period.

 


 Please continue check this advisory banner for further updates.    Refresh/reload the page periodically to ensure you are seeing the latest information.

   Home
Contact Us
 
 

County Route 546
Bikeway Planning & Development Study
Final Action Plan
July 2010

Please note that all of the documents below are provided in PDF.

Final Action Plan (29MB document)
Appendix A - NJDOT Bicycle Compatible Roadway Pavement Widths
Appendix B - Route 31 Initially Preferred Alertnative (IPA)
Appendix C - Study Task Force Meeting Memorandums
      Meeting 1
      Meeting 2
Appendix D - Preliminary Cost Estimating Sheets
      Bicycle_Lane_Striping_Cost Estimate
      Intersection_Striping_Cost Estimate
      Signed_Bicycle_Route_Cost Estimate
Appendix E - Signed Bicycle Route - Recommended Sign Locations

Appendix F - Funding Pedestrian and Bicycle Planning, Programs and Projects

 

 
TextMenu | Privacy Statement | Register for E-mail Notifications | Contact Us
201 Washington Crossing - Pennington Road  •  Titusville, NJ 08560  •  (609) 737-0605